What is this dataset?

A list of every local-government moratorium we could identify in the United States that targets one of these kinds of new development:

The legacy inventory aims for one local moratorium instrument per row, including adopted and proposed actions. Some combined identities still need reconciliation. The reviewed event cutoff is November 7, 2026 at 13:38:39.877065 UTC; source capture dates vary and later captures retain their actual timestamps. Searches across all states do not establish complete coverage, including for the previously searched May–July window. Ballot measures are a separate layer.

What is a moratorium?

A moratorium is a temporary pause that a local government places on accepting or approving permit applications for certain kinds of new development. Common features:

A moratorium is not a permanent ban. It is a temporary pause, intended to give regulators time to catch up.

Why are local governments doing this?

The short version: infrastructure is moving faster than zoning codes can adapt.

A typical hyperscale data center is 100+ megawatts of computing power, hundreds of thousands of square feet, with diesel backup generators, water-cooling systems, and electrical demand that can rival a small city. Most local zoning codes were written before this kind of facility existed and don't define it, classify it, or set standards for noise, water use, generator emissions, fire safety, or grid impact.

Faced with a specific proposal, a local government has two choices: approve under inadequate rules, or pause to write new rules. The moratorium is the second option.

The same dynamic applies to battery storage (especially after the January 2025 Moss Landing fire), to large solar and wind installations, and to cryptocurrency mining sites.

Why does this matter?

Three reasons:

  1. Capital flow. Announced data center capital commitments alone now exceed $1 trillion. Moratoria delay or block individual projects, with consequences for siting decisions, ratepayer costs, and regional economic development.
  2. Climate transition. Moratoria targeting solar, wind, and battery storage slow the buildout of clean-energy infrastructure that climate policy depends on.
  3. Local democracy. Moratoria are one of the most visible ways local governments push back against industries that have political support at the state and federal level. Tracking them maps a real political phenomenon.

How was this dataset compiled?

The original April collection used three phases; these document and extraction counts describe that historical cohort, not the November inventory:

  1. Document collection. AI-assisted research agents scanned municipal websites, agenda portals, board meeting minutes, planning commission records, state legislative databases, and news coverage across all 50 states. We collected approximately 4,400 original documents (PDFs, HTML pages, Word files), totaling ~12 GB.
  2. Classification. Each document was classified by type (ordinance, resolution, agenda, news article, etc.) and tagged for whether it was moratorium-related. About 709 documents are moratorium-related.
  3. Structured extraction. From the 709 moratorium documents, we used a large language model with a detailed schema to extract structured data: jurisdiction, dates, duration, sectors covered, exemptions, and 40+ other clause-level features. After confidence filtering, 348 instruments are coded line-by-line.

The original extraction review checked jurisdiction names and state codes. The current working inventory has 1328 rows; this does not mean the historical clause-extraction process was rerun for every current row.

For full methodology, see methodology.md.

How accurate is the data?

Confident on: state, jurisdiction, jurisdiction type, sectors covered, approximate enactment date.

Less confident on: exact ordinance numbers (many small townships don't post numbered ordinances online), final dispositions of pending or recently-extended moratoria, exact dates within ±a few weeks for events the local government hasn't published minutes for.

Where confidence is low, we mark a row with verify_notes indicating exactly what's uncertain and why. We never invent dates, ordinance numbers, or vote counts.

The mean confidence score on the 348 line-coded entries is 0.72 (range 0.40 to 0.95) on a 0-to-1 scale assigned by the language model.

My town is on the list — is that bad?

No, this is just an inventory of local-government action. A moratorium isn't a sign that something is wrong; it's a sign that your local government is actively managing land-use decisions. Many of the moratoria on this list have been replaced by permanent regulations within 6 to 12 months — exactly as intended.

My town isn't on the list — does that mean we don't have a moratorium?

It's possible we missed it. The dataset is built from publicly available records, and many small townships don't post agendas, minutes, or ordinances online. If you know of a moratorium we missed, open an issue and we'll add it in the next release.

Can I use this data for my own analysis / article / report?

Yes. The data is published under Creative Commons Attribution 4.0. You can reuse, redistribute, remix, and even use it commercially, as long as you credit the source. Suggested citation is in the README.

If you publish something based on this data, we'd love to hear about it — drop a note in Discussions or email Michael directly.

How often is this updated?

The latest qualified release is v2026.11.9.post6, published November 9 with pending source-specific QA. Use its tag and checksums for reproducible analysis; working main may include later corrections. Follow CITATION.cff and the release metadata for citation. No DOI is asserted.

Who built this?

Michael J. Bommarito, with substantial AI-assisted research. Methodology is fully documented and reproducible.

What if I disagree with how something is classified?

Open an issue with the specific row and your reasoning. Classification rules are documented in codebook.md; we'll either update the row or document the disagreement.

What's next on this dataset?

The landing page, state pages and geocoded exports already exist. Remaining work includes source-qualified status/expiry review, unresolved ballot qualification and implementation, instrument-identity reconciliation, consumer updates and a verified versioned release. Known gaps records evidence limits.

How should I interpret ballot measures?

The expanded publication contains 51 reviewed proposal and measure records (49 from the frozen cohort, Jay's solar ballot and a separate Wilmington litigated initiative), including advisory questions, temporary pauses, permanent restrictions and zoning questions. Seven additional candidate groups remain unresolved. A yes vote has different effects across measures; read the recorded wording, bindingness and yes direction. An unofficial result, certified vote count and legally operative restriction are separate observations. Ballot approval does not automatically increase the local moratorium count. See reviewed results and scope and interpretation.